The Master Design & Aesthetics Course
Prettau® Anterior® Crowns on Prettau® Zirconia
Target group: | Zirkonzahn zirconia and system users | ||
Course duration: | 2.5 days | ||
Participants: | 4 | ||
Venue: |
Education Center California June 19 – 21 June 22 – 24 Education Center Atlanta June 26 – 28 June 29 – July 1 Price: $ 1,200 |
||
Content: |
Learn digital modelling and aesthetic mastery of a Prettau® Zirconia substructure with Prettau® Anterior® setup. Once we complete the design process, Zirkonzahn will provide a six-unit anterior substructure made of Prettau® Zirconia as well as six individual crowns in Prettau® Anterior®. Together we learn how to perfect and stain both structures. Furthermore, you will practice joining the crowns to the substructure with a special glaze-melting formula. Finally we then layer the gingiva and gently veneer each crown with our ceramics and ICE Zirkon Stains by Enrico Steger. The end result is a beautiful demo model consisting of a Prettau® Zirconia framework with individual Prettau® Anterior® crowns.
|
Program
Day 1 (Full Day)
- Software training: plan and design the restoration
- Elaboration of unsintered Prettau® Anterior® crowns
- Elaboration of primary structure
- True color infiltration of crowns with Color Liquid Prettau® Anterior® Aquarell
- True color infiltration of primary structure with Color Liquid Prettau® Aquarell
- Dry and sinter structures overnight
Day 2 (Full Day)
- Examine results of the previous day
- Polishing the primary structure
- Checking the contact points
- Cementing the crowns onto the primary structure
- Initial ceramic layering and washbake
- Porcelain layering with ICE Zirkon Ceramik Transpa 3, Enamel S2 and Tissue
- Information about firing temperatures and holding times
- Refinement and surface designing
Day 3 (Half Day)
- Checking the fit
- Coloring the structure with ICE Zirkon 3D Stains by Enrico Steger/glaze material Glace Plus
- Cementing the titanium bases onto the Prettau® Zirconia structure
- Finalisation of the job
- Resolve outstanding issues